DP FMEA & OMC Projects

Timeline

2017

August 2017

OMC AB joined eVision software as Partner

January 2008 – PRESENT (9 YEARS)

Executive Director Offshore Maritime Consulting AB (Ltd)

2016

December 2013 – Present (2 years 5 months)

Norwegian & UK Sector North Sea working for London Offshore Consultants UK/Norway

2015

2015

Rig Move Transocean Winner DET NORSKE

Aug 2015

Rig Move Rowan Viking to Edvard Grieg Platform Lundin Norway

June 2015

Rig Move Rowan Viking Edvard Grieg Field Lundin

June 2015

IMCA Inspection ”Askholmen” Survey Project Statoil

May 2015

Rig Move Transocean Winner AHTS KL Sandefjord DET NORSKE

Apr 2015

Transocean Winner Unmooring Boyla Hook-Up Kneler Marine Rep Island Valiant

Mar 2015

Lundin Marine Rep Edvard Grieg On-board Normand Reach

Mar 2015

DET NORSKE Marine Rep Normand Prosper at East Kameleon

Feb 2015

MWS North Sea Atlantic Åsgard 450 Te Cassette Base Frame Installation

Feb 2015

MWS on board Skandi Arctic Boyla Rigid Spools Installation and Tie-in Procedure

Feb 2015

MWS for Subsea Installation of 260 Te Integrated Template Structure (ITS) at Statoil Gullfaks Rimfaksdalen on-board the Technip North Sea Atlantic

Jan 2015

Continuing Consultant Marine Rep work for LOC Norway

2014

Nov 2014

BG-Group Marine Rep AHTS KL Saltfjord – Transocean Searcher Rig-move from Knarr A to Jordbaer South-East

Oct 2014

Marine Warranty Surveyor Load Out Subsea Cable Nautilus Maxi Finland

Oct 2014

Transocean Winner Unmooring at Boyla and hook-up at East Kameleon AHV Island Valiant

Sep 2014

Started implementing ISSOW (Integrated Safe System of Work) Project Stockholm Ports

Sep 2014

Transocean Winner Pre-Lay Mooring East Kameleon AHV Rem Gambler

July 2014

Skandi Seven replacement of Risers Åsgard and Norne Statoil campaign

June 2014

Installation Water Injection Flow Line Deep Energy Technip Project Boyla Marathon

May 2014

Installation Gas Lift Flowline Apache II Project Marathon Boyla

Apr 2014

Installation Oseberg Delta II PL4 Flowline ”Subsea 7 Seven Navica”

Mar 2014

AHTS KL Saltfjord Rig Move Marathon Transocean Winner Vilje Sor – Boyla

Mar 2014

Pre-Lay anchor system for Marathon AHTS KL Saltfjord

Mar 2014

Rigmove Transocean Winner AHTS Skandi Iceman

Feb 2014

AHTS Skandi Iceman Vilje Sor / Kneler A Un-mooring Transocean Winner

Feb 2014

Statoil Pre-Lay Anchor Spread at Geitungen Appraisal Statoil Project AHTS KL Sandefjord

Jan 2014

Rig Move Ocean Vanguard Askja to tastaveden Statoil Project

2013

Dec 2013

Rig Move Polar Pioneer Troll Area Statoil North Sea.

Nov 2013

Tow Master Heading Control Maersk FPSO North Sea Producer.

Sept 2013

Rig Move Transocean Paul B Lloyd Jr at Clair Ridge

March 2013 – July 2013

BP Marine Representative onboard Safe Caledonia / BP ANDREW AREA DEVELOPMENT PROJECT.

2012

February 2012 – February 2013

Start BP Marine Representative onboard Borgholm Dolphin / BP ANDREW AREA DEVELOPMENT PROJECT.

2011

October 2011 – End January 2012

Start BP DP Marine Representative onboard DSV Akademik Tofiq Ismayilov Azerbaijan , Caspian Sea / Deep Water Gunashli Area.

July 2011 – End of August 2011

BP E&P Skarv development project BP FPSO SKARV Hook-Up Installation AHTS Maersk Logger.

June 2011

BP E&P Rigmove Transocean Paul B Loyd Jr Schiehallion to Devenick 2 Field.

June 2011

VAS BP E&P Shuttle Tanker Navion Norvegia.

April-May 2011

Project ConocoPhillips E&P Aberdeen Sesmic Aquisition Seismic Vessel Fairfield C-Pacer J-Block.

March 2011

VAS Marine Inspection BP E&P Apache II.

February 2011

Project BP E&P FPSO Schiehallion / Betty Knutsen.

January 2011

Skandi Neptune / Subsea 7 Orskov Shipyard Denmark 10-Year Class Inspection , Installation 250T Crane.

2010

December 2010 – Jan 2011

Judy Fiber Optic Pull-In PPCo DP Marine Representative onboard MPV Volantis.

October 2010

Caesar Tonga Field GoM Suta Subsea Underwater Termination Assembly DP Project Skandi Neptune Subsea 7.

Shell Spar May 2009-April 2010

Shell DP & Marine Representative for SHELL SPAR ( Moored to Ocean Floor ) PERDIDO Project, floating in 8,000 feet of water, is the world’s deepest-water oil /gas drilling and production platform.

2009

2008 , 2009, FMEA Verification Trial Program for Pipelay Barge , JASCON 25.

WEST PHOENIX, WEST HERCULES, WEST EMINENCE, JASCON 25

DP FMEA 2009 Singapore

Marine Operations and Support Shell Perdido Development 2009 for Shell International Exploration & Production Inc. Royal Dutch Shell’s Perdido is floating in 8,000 feet of water 200 miles south of Freeport. It’s a 50,000 ton structure.

2008

DP FMEA Positioning Mooring and Redundancy Test

OMC AB performed DP FMEA Positioning Mooring and Redundancy Test program for Det Norske Veritas DnV on behalf of Samsung Heavy Industries Co LTD & DSME Daewoo Shipbuilding and Marine Engineering in Korea 2008.


Gallery